Today has been a good day so much stuff got done and now I'm shattered.
After brekkie me and rich went out to prep the climbing frame to be put up. We got a few helpers to help lift it up and we heard a few cracking noises coming from one joint so desiderata it's safer to concrete it in the same day.
We dug some big holes to make sure even if we measured it out wrong the poles will still fit in the ground. As we was mixing the concrete all the children wanted to climb on the frame which at this point was unsafe so we had to constantly tell them off. One kid put his finger in our mix and tasted it lol he gave a funny look realising it's not edible. The children just wanted to step all over the concrete so we had to stand guard until school was over.
So its up and we have realised the monkey bars will be 2.5m off the floor so let's hope they don't do much falling. We need to buy more trees to finish the frame off with the monkey bars and balancing beam. It's going to be epic. Rich and I are thinking of having a grand opening ceremony once it's done with ribbon to cut the works.
I also spotted a guy who was a builder there wearing a huddersfield uni jumper which I was very shocked about lol
In the evening we went to a pork joint restaurant and had some georgus food and it came to about £1.20 each including drinks.
It was 3 girls last night with us and it was music night so we danced till we dropped. Rich and I have picked up the way Africans dance is like they have a soar back so spent most of the eve taking the mick out of them.
Anyway
No comments:
Post a Comment